Demolition toolbox talk

Demolition takes away the parts that hold a building up, so a wall, slab or roof can come down before anyone expects it. Even a small renovation that knocks out one wall carries this risk, along with live services hidden in walls and old materials such as asbestos and lead paint. The Construction Regulations require a survey, a method statement and a competent supervisor before demolition starts.

  • Excavation and structures
  • About 5 minutes
  • Free PDF with register
Download the PDF Blank register

Two A4 pages: the talk to read out, then an attendance register with 22 numbered rows. Or print this page from your browser.

Say this

Read it out, or put it in your own words. Stop and point at the real thing on this site wherever you can.

1. Survey and method first

Before any demolition, a competent person surveys the structure and writes a method statement that says how it will come down and in what order. A competent person appointed in writing supervises the work and checks the structure as we go. Follow the method. Do not decide on your own to knock out the next wall because it looks easy.

2. Know what holds it up

Some walls, beams and columns carry the floor or roof above. Never remove or cut any of them until the supervisor says it is propped or shored. Never work under a slab, beam or wall that is hanging over without proper support. If you hear cracking or see new cracks or movement, get out and warn everyone.

3. Do not overload floors

Rubble is heavy. Piles of broken brick and concrete on a slab or roof can make it collapse. Clear rubble often, and do not bring a machine onto a floor unless it has been confirmed strong enough to carry it.

4. Services off and confirmed

Electricity, water and gas must be found and made safe before demolition starts. A switch in the off position does not prove a cable is dead. If you find a cable, pipe or meter you were not told about, stop and report it.

5. Control falling rubble

Nothing is dropped outside the walls unless the area below is protected. Rubble goes down a proper chute into a skip or a fenced area. A chute steeper than 45 degrees must be closed on all four sides. Over doorways and walkways we use a catch platform or fence off the danger area.

6. Hidden dangers in old buildings

Old roof sheets, pipe lagging, floor tiles and paint may contain asbestos or lead. By law, demolition may not start until asbestos has been identified and removed or otherwise controlled. If you find material you are not sure about, stop, do not break it, and tell the supervisor. Keep dust down with water where you can, and make sure stairs and work areas are well lit before anyone works there.

Check on site today

  • Is there a method statement for today's demolition, and has the crew been told the sequence?
  • Who is the appointed demolition supervisor today?
  • Props and shoring in place before load-bearing parts are removed
  • Electricity, water and gas isolated and confirmed before work starts
  • Rubble cleared from floors, chute fixed and discharging into a skip or fenced area
  • Danger zones below fenced off, with catch platforms over walkways

Ask the crew

Open questions get people talking. Listen to the answers: they tell you what's really happening on site.

  • Which walls or beams in this building are holding something up?
  • What would make you stop and get out of the building?
  • Where does the rubble go, and how does it get there?
  • What materials here might be asbestos or lead, and what do we do if we find them?

Protective equipment for this job

  • Hard hat
  • Safety boots with a protective sole
  • Safety glasses or goggles
  • Dust mask or respirator suited to the dust, as the risk assessment says
  • Heavy-duty gloves
  • Hearing protection when using breakers and machines

What the law says

In our own words. Follow the links for the full wording.

  • Construction Regulations, 2014, regulation 14(1) to (4): Demolition workThe contractor must appoint a competent person in writing to supervise demolition, have a competent person carry out a structural engineering survey and write a method statement before work starts, and check the structure's integrity during the work. Floors and roofs may not be overloaded with debris, collapse must be prevented with shoring where needed, nobody may work under unsupported overhanging material, services must be located and made safe, work areas must be lit, safe access provided, and catch platforms, nets or fencing used where people could be hit by falling objects.Read on 21 November 2026
  • Construction Regulations, 2014, regulation 14(5) to (12): Demolition workMaterial may not be dropped outside the walls unless the area is protected. Rubble chutes must be well built and fixed, fully enclosed if steeper than 45 degrees, and discharge into a container or barricaded area. Equipment may only be used on floors strong enough for it. Where the risk assessment shows asbestos or lead, the work must follow the asbestos and lead regulations (subregulation (9) still names the Asbestos Regulations, 2001, which the Asbestos Abatement Regulations, 2020 have repealed and replaced). Explosives need a competent appointed person, and waste must be removed as soon as reasonably practicable.Read on 21 November 2026
  • Asbestos Abatement Regulations, 2020, regulation 24(i): ProhibitionNobody may carry out demolition work before all asbestos and asbestos-containing building material has been identified in the inventory of asbestos in place and safely removed or otherwise controlled, as far as reasonably practicable, so that asbestos dust is not released.Read on 21 November 2026

Sign the register

Everyone who listened signs page 2 of the PDF: name, company or trade, signature. Keep it in the site's health and safety file. How to fill in the register.

This talk is general safety information for South African sites, not legal advice. Your site's risk assessment, safe work procedures and health and safety plan come first. Written 21 November 2026 by Kindly Made from the sources linked above.