Say this
Read it out, or put it in your own words. Stop and point at the real thing on this site wherever you can.
1. Someone competent is in charge
All excavation work is supervised by a competent person appointed in writing. That person checks the ground before we dig, and inspects every excavation each day before the shift starts, after rain, after any fall of ground and after any damage to the supports. The results go in a register on site. If you do not know who that person is, ask today.
2. Never enter an unsupported trench
Nobody goes into a trench that has not been shored or braced, unless the sides have been cut back to a safe slope, or the competent person has given written permission because the ground is stable. Dry, hard-looking soil can still collapse. If you see cracks along the edge, a bulging wall, water seeping in or small bits of soil falling, get out straight away and report it.
3. Keep the edges clear
Do not put spoil, bricks, pipes or machines close to the edge, because their weight can push the wall in. Keep the TLB and trucks back from the edge unless the excavation is properly supported. When a truck tips into or near a trench, use a stop block so it cannot roll in.
4. A safe way in and out
Every trench where people work needs a safe way in and out, such as a ladder, and it must be no further than six metres from where anyone is working. Do not climb the shoring or jump in and out.
5. Find services before you dig
Before digging we find out where electricity, water, gas and other services run. Dig by hand near them. If you hit or uncover a cable or pipe you were not expecting, stop, step away, keep others back and tell the foreman. Do not touch it or try to pull it out.
6. Stop people falling in
Where the public can get near, or people could be hurt, the excavation gets a barrier or fence at least one metre high, as close to the edge as practicable, with lights or clear markers at night. Warning signs go up next to trenches where people are working. A deep or narrow excavation can collect fumes, so it may be treated as a confined space.
Check on site today
- Who is the appointed excavation supervisor, and is today's inspection in the register?
- Is every trench people work in shored, braced or cut back to a safe slope?
- Spoil, materials and machines kept back from the edges
- A ladder or other safe access within six metres of everyone in the trench
- Services marked, and hand digging where they run
- Barriers, warning signs and night lights in place where needed
Ask the crew
Open questions get people talking. Listen to the answers: they tell you what's really happening on site.
- What signs tell you a trench wall is about to go?
- What do you do if you uncover a cable or pipe nobody told you about?
- Where should the spoil from today's trench go?
- If someone was buried, what should we do and what should we not do?
Protective equipment for this job
- Hard hat
- Safety boots
- High-visibility vest when working near machines or traffic
- Gloves for handling shoring and pipes
What the law says
In our own words. Follow the links for the full wording.
- Construction Regulations, 2014, regulation 13(1) and 13(2)(a) to (e): ExcavationThe contractor must have all excavation work supervised by a competent person appointed in writing and must check ground stability before digging. Nobody may work in an excavation that is not adequately shored or braced, unless the sides are sloped back enough or the ground is stable and the competent person has given written permission (with an engineer's decision where there is doubt). Loads, material and plant must be kept away from edges where they could cause a collapse, and nearby buildings and roads must be kept stable.Read on 21 November 2026
- Construction Regulations, 2014, regulation 13(2)(f) to (l): ExcavationSafe access must be provided no further than six metres from where anyone in the excavation is working. Services such as electricity, water and gas must be located and made safe before digging that could affect them. The competent person must inspect excavations daily before each shift and after blasting, unexpected ground falls, damage to supports and rain, and record the results in a site register. Excavations near the public must have a barrier at least one metre high and lights or markers at night, confined space precautions apply where relevant, and warning signs must be placed where people are working.Read on 21 November 2026
- Construction Regulations, 2014, regulation 1: Definitions ("excavation work")Excavation work means making any man-made cavity, trench, pit or depression by cutting, digging or scooping, so the rules cover small foundation and drain trenches too.Read on 21 November 2026
Sign the register
Everyone who listened signs page 2 of the PDF: name, company or trade, signature. Keep it in the site's health and safety file. How to fill in the register.
Free from sitediary.co.za/toolbox-talks/excavations/. The attendance register is page 2 of the PDF, or sitediary.co.za/toolbox-talks/attendance-register/. General safety information, not legal advice: follow your site's risk assessment and health and safety plan.
This talk is general safety information for South African sites, not legal advice. Your site's risk assessment, safe work procedures and health and safety plan come first. Written 21 November 2026 by Kindly Made from the sources linked above.